Terminal extension that will create local employment boost gets the go-ahead
A proposed extension to the new terminal at London Southend Airport that will result in more than 300 additional new jobs being created has been given the go-ahead by Rochford Council.
Phase 1 of the light and airy, fly-through terminal became operational on 28 February and is less than 100 paces from the new railway station. Passengers flying out from the airport will wait for a maximum of four-minutes for security, whilst those arriving with just hand luggage can expect to travel from plane to train within 15 minutes of leaving the aircraft.
This Phase 2 extension is to ensure those high standards of service are not compromised as passenger numbers grow towards 2 million per year by 2020.
The terminal building will now become 90 metres longer. The number of check in desks / baggage drop off points will increase, as will the amount of security screening channels. The Departure Lounge will grow in size to enhance the experience for passengers relaxing and awaiting boarding after security. A larger Arrivals area will have enhanced baggage reclaim facilities and a larger immigration area. Retail and catering facilities will be expanded throughout the terminal in order to provide a much wider range of shops and services available to passengers.
The 300 new jobs will arise from the increase in Southend based aircraft which will result in a variety of additional operational and service roles such as passenger service, security, retail, catering, baggage handling, engineering and maintenance, plus airline crew from London Southend based airline operations.
London Southend Airport Managing Director Alastair Welch says “We are very pleased that Rochford Council has indicated they support this extension, which will ensure that we are able to maintain the high levels of customer service we intend to be the hallmark of London Southend Airport as our passenger numbers grow. This is also further evidence of the role the redeveloped airport is playing in supporting the regeneration of the wider economy.”
Construction work on the extension is planned to get underway later this year.
I am the very proud owner of thebestofsouthend. My aim is to really shout about why Southend is so great & champion our local business owners who do a really great job!
We encourage local people...
The following Cookies are used on this Site. Users who allow all the Cookies will enjoy the best experience and all functionality on the Site will be available to you.
You can choose to disable any of the Cookies by un-ticking the box below but if you do so your experience with the Site is likely to be diminished.
In order to interact with this site.
To help us to measure how users interact with content and pages on the Site so we can make
things better.
To show content from Google Maps.
To show content from YouTube.
To show content from Vimeo.
To share content across multiple platforms.
To view and book events.
To show user avatars and twitter feeds.
To show content from TourMkr.
To interact with Facebook.
To show content from WalkInto.